Rear extensions
The most common and usually the least disruptive. Open the back of the house into the yard with living, dining and kitchen in one space. Often the family can stay living at home throughout.
Stamp duty, agent fees, conveyancing, removalists, and a school catchment you may not get back. For a lot of Melbourne families, extending the home they already own is the cheaper answer and the one they actually wanted.
An extension only works if the new part feels like it belongs. That means matching floor levels, carrying ceiling heights through where you can, and choosing materials that sit properly against the original house rather than fighting it.
The other half is what you cannot see. Setbacks, overlays, site coverage, easements and neighbouring windows all decide what your block will actually allow. We check that before you spend anything on design, so you are not paying an architect to draw something council will not approve.
Book a site visit
Which one suits you comes down to your land size, your budget and how much disruption you can live with.
The most common and usually the least disruptive. Open the back of the house into the yard with living, dining and kitchen in one space. Often the family can stay living at home throughout.
The answer when the block is tight and the yard is already small. Bedrooms and bathrooms move upstairs. Roof comes off, so this is the one where living elsewhere for a while is usually unavoidable.
Using the dead space down the side of the house. Narrow, awkward and heavily governed by setbacks, which is exactly why the feasibility check matters before anything gets drawn.
Roofed outdoor living that extends the house without extending the floorplan. Cheaper per square metre than enclosed space and it makes the yard usable most of the year.
Where old meets new is where a bad extension shows. Floor levels, ceiling heights and how the roofline resolves are worth getting right at design stage, not on site.
Setbacks, site coverage, overshadowing and overlays decide the shape before anyone draws it. We check your block early so the design starts from what is actually possible.
Rear extensions often let you stay. Second storey work usually does not. Knowing which one you are facing changes the budget, because rent is part of the real cost.
We visit your place, walk the block, and have an honest conversation about budget and what the site will allow.
Design, engineering and permits are organised, then a quote with the inclusions written out line by line.
Trades scheduled, site kept tidy, and regular updates so you're never wondering what happened this week.
A proper walkthrough, every detail reviewed, and we still answer the phone long after handover.
Can't find what you're after? Give us a call and we'll talk it through.
Ask us a questionIt depends on size, site access, whether it's single or double storey, and the finishes. A rear extension on an easy block sits a long way from a second storey addition on a narrow site. Any builder quoting over the phone is guessing. We'll visit, look at what's realistic for your block, and give you an honest range before you spend money on drawings.
You'll almost certainly need a building permit. Whether you also need a planning permit depends on your council, the overlays on your land, how close you're building to the boundary and whether you're overshadowing a neighbour. We check all of this early and manage the applications for you.
Usually yes for a rear extension, since the existing house stays sealed and liveable for most of it. A second storey addition means the roof comes off, so that one generally isn't practical. We'll tell you at the quote stage, because rent is a real part of the budget.
Design and permits usually take longer than people expect, and construction is the shorter half. Once we've seen your site we'll give you a realistic timeline for both stages, plus updates as we move through them.
That's a design decision, and there are two honest approaches. Match the original so the join disappears, or make the new part deliberately contemporary so the contrast reads as intentional. Both work. What doesn't work is landing halfway between them by accident.
Both. If you already have plans, we'll price and build from them. If you're starting from a rough idea and a folder of saved photos, we can bring in design and drafting so you're not managing three separate companies.
If the problem is layout rather than floor area, reworking what's already there is often the better spend. Renovations
If your block is large enough, two dwellings may return more than extending one. Dual occupancy
Send through a few photos of your place and a rough idea of what you'd like to add. We'll come back with honest advice on whether your block will allow it, no pressure either way.
Request a quote Prefer to talk? 0433 690 857